I finally quit using wire nuts on panel splices after a call back in Boise
Used to twist and tape every splice in the can and lost a whole Saturday chasing a ground fault from a loose nut that vibrated apart, so now everything gets lever nuts and a label, and I want to know if anyone else made that switch or if I'm just covering for my own sloppy first install.