Why does nobody talk about the gap behind the toilet when tiling?

I finished my main bathroom in March and realized I left a 2-inch gap behind the toilet base because I tiled to the flange, not under it. Now I have to cut tiny filler pieces. Has anyone else dealt with this and have a better method?
3 comments

Log in to join the discussion

Log In
3 Comments
harperr82
harperr822d ago
My last bathroom taught me to listen to casey818 and pull the toilet first.
2
casey818
casey8182d ago
Actually tile under the toilet. Pull it up first. Way cleaner look, no weird gaps to deal with later.
1
rodriguez.mia
Learned that the hard way too. Looks so much better when you do it right.
1