Tried bagging mortar instead of mixing in the tub and the trowel about fell out of my hand
Mixed a small batch of type N in a bucket with a paddle last Tuesday and it came out lumpy, so I grabbed a bag of preblended and just added water like the bag says. The stuff set way faster than I was ready for and I barely got the last course down before it stiffened up on me. Do you all stick to one mix method or switch it up depending on how small the job is?