PSA: laid 140 yards in a Bellevue office on Monday, then spent Thursday pulling tack strips off concrete that crumbled
Monday I had a two man crew and the glue was going down smooth on a 140 yard office pour in Bellevue, done by 2pm and I actually got home for dinner. Thursday a different job had the tack strip pulling chunks out of old crumbly concrete and I was patching pockmarks for six hours, way past the bid. Now I'm stuck on whether I should just price every concrete strip job with a patch allowance or keep it hourly and explain the mess to the customer. Half of me says flat rate builds trust, the other half says I'm eating weekends on bad slabs. What do you all do when the concrete turns to sand under the strip?