Dropped $340 on a laser level for a 30x40 slab and the thing still drifts after 20 minutes in the sun
Bought it at the tool shop off Route 9 in Poughkeepsie back in March and it wanders enough that I keep second guessing my screed, so has anyone figured out a way to keep these things steady on a hot pour or should I just go back to a string line?