V
19

Showerthought: The time I forgot to wet the slab before a big pour

I was out on a job near Columbus last August, pouring a 30x40 foot garage floor. Got so caught up in setting forms I completely spaced wetting the subgrade before the truck showed up. Ended up with a bunch of spider cracks from the concrete drying too fast on top. Anyone else learned this lesson the hard way, or was it just me being careless?
3 comments

Log in to join the discussion

Log In
3 Comments
alice928
alice9281d ago
Did that once, concrete set faster than my 10 minute bathroom break.
6
paige166
paige16621h ago
Saw something about concrete drying real fast online, is that why the break didn't work out for ya @alice928? Sounds like you barely made it back in time.
2
emma_baker61
8 minutes is pretty generous actually, it was more like a race against the clock for a solid hour on my end. At least you got a bathroom break out of it!
2