TIL a warped fire pot lid cost me 6 hours of cleanup at the shop in Rochester
The warp let ash fall into the blower line during a 4 hour forge run and I spent 6 hours digging it out of the tuyere instead of finishing a rail job. Check your lids for gaps before the next heat, and if you've got a better way to clear a packed blower line, I'm all ears.